Documents
Background Information and Documents
If you’d like to learn more about your wastewater collection and treatment system, click on the links below to download specific background documents.
General Sewer Plan & Wastewater Facility Plan
- General Sewer Plan Update_Final_2017-12-18
- Community Generated Alternative Solutions_Final_2018-7-30
High Strength User Engineering Analyses
- Technical Memo: Pretreatment Addendum (September 2017)
- Description of BOD Load Revisions (August 2017)
- Technical Memo: Pretreatment Options (August 2017)
- 85% Pretreatment Example
- Technical Memo: Pretreatment & Source Control (December 2016)
- Technical Memo: High Load User Sampling Plan (July 2016)
- Guidance Document: Brewery Wastewater Guidance (April 2016)
- Guidance Document: Brewery Wastewater BMPs
Additional Engineering Analyses
- Technical Memo: Flow & Load Projections (January 2017)
- Technical Memo: Inflow and Infiltration (December 2016)
- Technical Memo: Growth Projection (October 2016)
- Technical Memo: Growth Projection (March 2016)
Financial and Rate Analyses
- Financial Outlook (August 2017)
- High Strength Surcharge Rate Calculator (Interactive Excel File) (August 2017)
- Proposed Residential Rate Summary (August 2017)
- Technical Memo: High Strength Rates (August 2017)
- Technical Memo: System Development Charges (August 2017)
- Determination of Equitable Costs (May 2017)
Additional Information
- Cities 101: Sewers
- Value Planning Final Report
- CERB Alternative Analysis