This week s construction will consist of:

  • Roadway Excavation (from 1st to 2nd Street)
  • Roadway Base (from 1st to 2nd)
  • “Grey” Concrete Sidewalks (delayed last week due to rain)
  • Colored-Stamped Concrete portions of sidewalk

Excavation for the water line on lower Russell will begin Monday of next week. One lane of traffic will remain open. If weather holds out there is a potential to have a base layer of pavement on the portion of Russell between 1st and 2nd street by late next week. If this comes to fruition, that portion of the road will open to traffic. We do have some rain in the forecast so we will see what happens.

Stay safe,
Karl Russell
City of Stevenson