This week will consist of:
  • Sidewalk removal
  • Catch basin installation
  • Curb inlet installation
  • Preparation for supporting existing roof supports for two buildings on East side while new sidewalk is being poured.
  • Tapping downspouts into existing storm system
  • Potholing for existing utilities on Lower Russell
Stay safe,
Karl Russell
City of Stevenson